Finance

Hungarian Nuclear Plant to Cut Block 2 Capacity 50% for Repairs

Hungary’s nuclear energy authority said output at one block of the country’s sole atomic power station will be cut by 50% from April 29 for repairs on a generator support system.

B
Bloomberg
April 28, 2026·1 min read
Hungarian Nuclear Plant to Cut Block 2 Capacity 50% for Repairs

Image: Bloomberg

Hungary’s nuclear energy authority said output at one block of the country’s sole atomic power station will be cut by 50% from April 29 for repairs on a generator support system.

Original article

Hungarian Nuclear Plant to Cut Block 2 Capacity 50% for Repairs

Published by Bloomberg

Read full article